Schlema thermal resort

New building of the Aktinon spa with remedial, salt water, movement, outdoor salt water, sauna pools, sauna, steam baths, special balneal procedures with Radon, brine, etc. Integration of the cogeneration unit, technological equipment for building constructions, instrumentation and control, insulation, ducts, treatment of pool water designing.

Period for processing: 1996-2004
Share of outside co-workers: complete processing by the Wach office.

Indoor swimming pool in Marianske Lazne

Complete restoration of the 25-m swimming pool and the children’s pool, replacement of the roof, area management project, building construction license project, building construction operational design, author supervision.

Period for processing: 2001-2002
Share of outside co-workers: complete processing by the Wach+Marienprojekt, architecture by Ateliery Vystyd.

Leuze Stuttgart mineral resort

Restoration and modernization of the mineral cold resort hall and pool for exercising, reconstruction, modernization and extension of the sauna complex, new building of the children’s part, warm water bottom preparation, technological equipment for building constructions, instrumentation and control, building construction control engineering, insulation, drain, treatment of pool water.

Period for processing: 1996-2006
Share of outside co-workers: complete processing by the Wach office.

Wiesenbad thermal resort

New building of the resort hotel, outdoor swimming pool, dining room, and arcade.
Designing: technology only.

Period for processing: 1993-1995
Share of outside co-workers: complete processing by the Wach office.

Bad Schönborn Thermarium

New building of the outdoor pool. Pool water treatment designing.

Period for processing: 1990 - 1991
Share of outside co-workers: complete processing by the Wach office.

Balneal plant Bad Bevensen

New building. Pool water treatment designing.

Period for processing: 1993 - 1994
Share of outside co-workers: complete processing by the Wach office.

Thermal outdoor heated pool in Bad Bevensen

New building. Pool water treatment plant designing.

Period for processing: 1990 - 1991
Share of outside co-workers: complete processing by the Wach office.

Pyong Yang Leisure Time Centre, North Korea

New building of the leisure time complex with the pool with waves, 5 thermal indoor and outdoor pools, sports pool, children’s part, 2 saunas, gastronomy, and 12 tobogans in total length of approx. 1000 m. technological equipment for building constructions, instrumentation and control, building construction control engineering, electrical equipment, insulation, drain, pool water treatment designing.

Period for processing: 2005
Share of outside co-workers: complete processing by the Wach office.

Neustadt-Aisch outdoor swimming pool

Complete redevelopment of the swimming pool, including bathing boxes, showers, and adjacent rooms, general projecting. technological equipment for building constructions, instrumentation and control, building construction control engineering, electrical equipment, insulation, drain, pool water treatment plant designing.

Period for processing: 2001-2006
Share of outside co-workers: complete processing by the Wach office.

Geislingen swimming pool

New building and modernization of the swimming pool with the combi-pool, paddling pool, including bathing boxes, showers, and adjacent rooms, general designing. technological equipment for building constructions, instrumentation and control, building construction control engineering, insulation, drain, pool water treatment designing.

Period for processing: 2003-2005
Share of outside co-workers: complete processing by the Wach office.

Salt water pool for Libuše Bath House at the Karlova Studanka spa

Installation of the salt water remedial pool with attractions in the existing LD Libuse. building construction license project, building construction operational design.

Period for processing: 2004-2006
Share of outside co-workers: technology by Wach office, building part by OMNIA Projekt.

Balingen swimming pool

New building and modernization of the swimming pool with – the combi-pool for swimmers and nonswimmers, including bathing boxes, showers, and adjacent rooms. General designing, technological equipment for building constructions, building construction control engineering, insulation, drain, pool water treatment designing.

Period for processing: 2004-2006
Share of outside co-workers: complete processing by the Wach office.

Summer resort swimming pool at the Karlova Studanka Spa

New building of the pool with salt water and attractions, 100 m2 with facilities, building construction license project, building construction operational design, author supervision.

Period for processing: 2005-2007
Share of outside co-workers: complete processing by the Wach office.

Indoor swimming pool and outdoor heated pool in Marktoberdorf

Reconstruction and modernization of the outdoor heated pool with sauna.

Period for processing: 1991–1994
Share of outside co-workers: complete processing by the Wach office.

 